Infrastructure Life Cycle Assessment Case Study
Read this Case Study on HS2 London Euston Railway StationProject: HS2 London Euston Railway Station
HS2 London Euston Railway Station, RIBA Stage 2 design, London, 87000m2- Investor: High Speed Two (HS2) Limited. HS2 is the company responsible for developing and promoting the UK’s new high-speed rail network. It is funded by grant-in-aid from the UK government. HS2 is an executive non-departmental public body, sponsored by the UK Department for Transport.
- Contactez: James Robb |Senior Sustainability Consultant james.robb@wsp.com | LinkedIn
- Type: New construction
- Certification: Carrying out this analysis allows the project to achieve 2 Innovation credits under the BREEAM New Construction 2014 scheme, providing an additional 1% to the overall score. The project is expected to achieve BREEAM Excellent as a minimum.
- One Click LCA Expert: WSP
- One Click LCA used for: The One Click LCA Revit plugin was used to extract materials and quantities data from a combined project BIM model. This contained all Architectural (Wilkinson Eyre Architects) and Structural (WSP Structures) RIBA Stage 2 design information.

Photo by WilkinsonEyre
Vous pourriez également aimer
-
One Click LCA lève 40 Millions d'euros d'investissement stratégique avec PSG et InfraVia
-
Infrastructure
Get Life Cycle Assessment credits for CEEQUAL, PAS, or Envision with the easy to use Life Cycle Assessment software for Infrastructure.
-
Carbon footprinting
Measure your building’s carbon footprint with our easy to use software tools and learn how to design greener buildings.
-
Mennica Legacy Tower – Poland (BREEAM)
Read this BREEAM Life Cycle Assessment credits Case Study on the Mennica Legacy Tower, shortlisted for the BREEAM Awards 2018 with Outstanding score.